Project   Description & Scope of Work Client Country Duration of Construction Period Date Completed Value (in USD) Contact Persons(for references)
Grabbing, grading, leveling, Compacting & Supply of subbase   & Asphalt for road in accordance to ASTM Standard Amanath Baghdad Iraq 60 Days 2008 IQD 1.514B Amanath Baghdad
Grabbing, grading & leveling of road for CNPC Halfaya Camp. PetroChina Co. Ltd. Iraq 30 days 2011 368500 PetroChina Co. Ltd.
Topographic Survey
64 Km Pipeline Project 28” & 32” Pipes Welding, Layout,   Repair, Coating & Insulation (with Fibre Glass) SOC Iraq 6 months 1993 3.135M Foreign Purchasing Dept.
Cleaning 8 Vessels ( w/ sand blasting & coating) in South   Central Sta. Worley Parsons Iraq 2 months 2010 452940 Worley Parsons
Open blockage of pipe between 4th stage to tank underground size   24" in South Central Station Worley Parsons Iraq 1 week 2010 24000 Worley Parsons
Cleaning 10 Vessel ( with sand blasting & coating) and   Replacement of 150 vessels in Quirinat Worley Parsons Iraq 3 months 2010 790272 Worley Parsons
Scaffolding Erection and Cleaning 4 vessels Al Shamya Station Worley Parsons Iraq 1 month 2011 324665 Worley Parsons
Cleaning storage tank 10000 cum in DS1 Worley Parsons Iraq 1 month 2011 275000 Worley Parsons
Remove and clean the demister pad inside the vessel and scaffolding erection DS1 Worley Parsons Iraq 2 weeks 2011 68000 Worley Parsons
Cleaning tank no. 2 & repair using Belzona materials in   DS2 Worley Parsons Iraq 1 month 2011 190000 Worley Parsons
Cleaning 2 vessel and Scaffolding    Erection in DS2 Worley Parsons Iraq 1 month 2011 113000 Worley Parsons
Cleaning & Shutdown of 8 vessels in DS5. Worley Parsons Iraq 3 months 2011 806000 Worley Parsons
Civil Works for Solidification of Sulphur Basin & Liquid Sulphur Pit (Clearing,   Demolition, Grabbing, Scarifying, Backfill, levelling, Compaction &   Access Roads) PEG/SOC Iraq 4 Month 2012 2.1M PEG/SOC
TAR   Shutdown Services 10,000 cu.m supplied Scaffolding & General   Civil/Mechanical Works ROO (BP) Iraq 4 years 2013-2017 18,0M ROO (BP)
Short   Term Fabrication Maintenance 15,000 cu.m supplied Scaffolding & General   Civil/Mechanical Works ROO (BP) Iraq 1 Year 2014 20,0M ROO (BP)
Pickling   & Passivation of Pressure vessel (11 Nos. S.S. Pressure Vessels) PEG Iraq 3 months 2018 75000 PEG
Supply   & Construction of Shelter (Floor Area= 1,000 m2) PEG Iraq 2 months On-going 237500 PEG
Supply   & Install Soil Embankment ( 80,000 m3) PEG Iraq 4 months On-going 2.19 M PEG
Supply   & Install CARAVAN ( TCF & Accommodation Camp) PEG Iraq 9 months On-going 795000 PEG
TWO   TANKS DEMOLITION, CIVIL WORK AND COATING WORK CPECC Iraq 4 months On-going 1.950 M CPECC
Grabbing, grading, levelling, Compacting & Supply of subbase   & Asphalt for road in accordance to ASTM Standard Amanath Baghdad Iraq 60 Days 2008 IQD Amanath Baghdad
1.514 B
Grabbing, grading & levelling of road for CNPC Halfaya Camp. PetroChina Co. Iraq 30 days 2011 368500 PetroChina Co.
Topographic Survey Ltd. Ltd.
64 Km Pipeline Project 28” & 32” Pipes Welding, Layout,   Repair, Coating & Insulation (with Fibre Glass) SOC Iraq 6 months 1993 3.135 M Foreign Purchasing Dept.
Cleaning 8 Vessels (w/ sand blasting & coating) in South   Central Sta. Worley Parsons Iraq 2 months 2010 452940 Worley Parsons
Open blockage of pipe between 4th stage to tank underground size   24" in South Central Station Worley Parsons Iraq 1 week 2010 24000 Worley Parsons
Cleaning 10 Vessel (with sand blasting & coating) and   Replacement of 150 vessels in Quirinat Worley Parsons Iraq 3 months 2010 790272 Worley Parsons
Scaffolding Erection and Cleaning 4 vessels Al Shamya Station Worley Parsons Iraq 1 month 2011 324665 Worley Parsons
Cleaning storage tank 10000 cum in DS1 Worley Parsons Iraq 1 month 2011 275000 Worley Parsons
Remove and clean the demister pad inside the vessel and   scaffolding erection DS1 Worley Parsons Iraq 2 weeks 2011 68000 Worley Parsons
Cleaning tank no. 2 & repair using Belzona materials in DS2 Worley Parsons Iraq 1 month 2011 190000 Worley Parsons
Cleaning 2 vessel and Scaffolding Erection in DS2 Worley Parsons Iraq 1 month 2011 113000 Worley Parsons
Cleaning & Shutdown of 8 vessels in DS5. Worley Parsons Iraq 3 months 2011 806,000 Worley Parsons2
Civil Works for Solidification of Sulphur Basin & Liquid   Sulphur Pit (Clearing, Demolition, Grabbing, Scarifying, Backfill, levelling,   Compaction & Access Roads) PEG/SOC Iraq 4 months 2012 2.1 M PEG/SOC
TAR Shutdown Services 10,000 cu.m supplied Scaffolding &   General Civil/Mechanical Works ROO (BP) Iraq 4 years 2013-2017 18 M ROO (BP)
Short Term Fabrication Maintenance 15,000 m 3 supplied Scaffolding   & General Civil/Mechanical Works ROO (BP) Iraq 1 Year 2014 20 M ROO (BP)
Pickling & Passivation of Pressure vessel (!1 Nos. S.S.   Pressure Vessels) PEG Iraq 3 months 2018 75000 PEG
Supply & Construction of Shelter (Floor area = 1,000 m 2) PEG Iraq 6 months 2018-2019 237500 PEG
Supply & Install Soil Embankment (80,000 m 3) PEG Iraq 10 Months 2018-2019 2.19 M PEG
Supply of Caravans PEG Iraq 6 months 2018-2019 475550 PEG
Two Tanks Demolition, Civil Work And Coating Work CPECC Iraq 4 months On-going 1.950 M CPECC
Civil Works for 10+4 Turbopump FAO Depot PEG Iraq On going On going 11.3 M PEG
Equipment & Building Foundation on Call-off Basis for BNGL CPECC Iraq On going On going - CPECC
Electrical and Instrumentation /Automation Works PEG Iraq On going On going 6.95 M PEG