Grabbing, grading, leveling, Compacting & Supply of subbase & Asphalt for road in accordance to ASTM Standard

Amanath Baghdad

Iraq

60 Days

2008

IQD 1.514B

Amanath Baghdad

Grabbing, grading & leveling of road for CNPC Halfaya Camp.

Topographic Survey

PetroChina Co. Ltd.

Iraq

30 days

2011

368,500

PetroChina Co. Ltd.

64 Km Pipeline Project 28” & 32” Pipes Welding, Layout, Repair, Coating & Insulation (with Fibre Glass)

SOC

Iraq

6 months

1993

3.135M

Foreign Purchasing Dept.

Cleaning 8 Vessels ( w/ sand blasting & coating) in South Central Sta.

Worley Parsons

Iraq

2 months

2010

452,940

Worley Parsons

Open blockage of pipe between 4th stage to tank underground size 24" in South Central Station

Worley Parsons

Iraq

1 week

2010

24,000

Worley Parsons

Cleaning 10 Vessel ( with sand blasting & coating) and Replacement of 150 vessels in Quirinat

Worley Parsons

Iraq

3 months

2010

790,272

Worley Parsons

Scaffolding Erection and Cleaning 4 vessels Al Shamya Station

Worley Parsons

Iraq

1 month

2011

324,665

Worley Parsons

Cleaning storage tank 10000 cum in DS1

Worley Parsons

Iraq

1 month

2011

275,000

Worley Parsons

Remove and clean the demister pad inside the  vessel and scaffolding erection DS1

Worley Parsons

Iraq

2 weeks

2011

68,000

Worley Parsons

Cleaning tank no. 2 & repair using Belzona materials in DS2

Worley Parsons

Iraq

1 month

2011

190,000

Worley Parsons

Cleaning 2 vessel and Scaffolding  Erection in DS2

Worley Parsons

Iraq

1 month

2011

113,000

Worley Parsons

Cleaning & Shutdown of 8 vessels in DS5.

Worley Parsons

Iraq

3 months

2011

806,000

Worley Parsons

Civil Works for Solidification of Sulphur Basin  & Liquid Sulphur Pit (Clearing, Demolition, Grabbing, Scarifying, Backfill, levelling, Compaction & Access Roads)

PEG/SOC

Iraq

4 Month

2012

2.1M

PEG/SOC

TAR Shutdown Services 10,000 cu.m supplied Scaffolding & General Civil/Mechanical Works

ROO (BP)

Iraq

4 years

2013-2017

18,0M

ROO (BP)

Short Term Fabrication Maintenance 15,000 cu.m supplied Scaffolding & General Civil/Mechanical Works

ROO (BP)

Iraq

1 Year

2014

20,0M

ROO (BP)

Pickling & Passivation of Pressure vessel (11 Nos. S.S. Pressure Vessels)

PEG

Iraq

3 months

2018

75,000

PEG

Supply & Construction of Shelter (Floor Area= 1,000 m2)

PEG

Iraq

2 months

On-going

237,500

PEG

Supply & Install Soil Embankment ( 80,000 m3)

PEG

Iraq

4 months

On-going

2.19 M

PEG

Supply & Install CARAVAN ( TCF & Accommodation Camp)

PEG

Iraq

9 months

On-going

795,000

PEG

TWO TANKS DEMOLITION, CIVIL WORK AND COATING WORK

CPECC

Iraq

4 months

On-going

1.950 M

CPECC


PROJECT PICTURES

 

           

                                                              

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PEG ENGINEERING & CONST’N- IRAQ- CONSTRUCTION OF SHELTER FAO OIL DEPOT-CONCRETE WORKS- FOUNDATION

  

 

 

 

CONCRETE WORKS- CONCRETE SLAB PEG ENGINEERING & CONST’N DMCC- IRAQ-FAO
DEPOT-CONSTRUCTION OF SHELTER

 

 

 


     

 

 

 

 

 

  

 

 

PEG ENGINEERING & CONST’N DMCC- IRAQ- CONSTRUCTION OF SHELTER- FAO

DEPOT-CONCRETE WORKS- CONCRETE SLAB

 

 

 

 

 


 

  

 

  

 

PEG ENGINEERING & CONST’N DMCC- IRAQ- EARTHWORKS- SITE PREPARATION & SOIL EMBANKMENT

 

 


 

 

      

 

       

PEG ENGINEERING & CONST’N DMCC- IRAQ- EARTHWORKS- SITE PREPARATION & SOIL EMBANKMENT

 

 

 


    

       

 

    

 

  

 

  

 

VARIOUS JOB ORDERS

WORKSHOP/ FABRICATION